Foundation laid for two-level flyovers and reconstruction of the road bridge on Saadi Sherozi Avenue in Dushanbe


On 27 October, Emomali Rahmon and Rustami Emomali laid the foundation stone for two-level roads on Saadi Sherozi Avenue and for the reconstruction of the road bridge over the Dushanbe River.
According to the official report, the construction of 3 two-level flyovers on Saadi Sherozi Avenue and the reconstruction of the road bridge over the Dushanbe River are being carried out under the Dushanbe master plan and the Saadi Sherozi Avenue reconstruction project. Emomali Rahmon was informed that the two-level road section at the junction of Saadi Sherozi Avenue and Nemat Karaboev Street will be 850 meters long in total. It will have 8 traffic lanes for vehicles in both directions, with each lane 3.5 meters wide. The junctions will also be built with 3 traffic lanes. It was also reported that another two-level road section at the junction of Hafez Sherozi Avenue and Qahhorov Street will be 4,300 meters long in total and will be built with 8 lanes in line with international standards. Dedicated lanes for buses and trolleybuses will be set aside on some parts of Saadi Sherozi Avenue. The road bridge over the Dushanbe River will be reconstructed with a length of 115 meters, a width of 40 meters, 8 traffic lanes and a load-bearing capacity of 100 tonnes.
Source: Khovar official news channel
Source: Khovar official news channel
Source: Khovar official news channel
Source: Khovar official news channel